Lowering Procedure; Raising Procedure; Fold Down Procedure; Erection Procedure - Upright X26 Manual Del Usuario

Ocultar thumbs Ver también para X26:
Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

504165-002
L
O W E R T H E
This procedure applies only to the X26 model for the purpose of passing through a standard double door-
way. Guardrails must be returned to proper position before using the machine.
L
OWERING
1. Ensure that the slide-out deck extension is fully retracted and the deck pin is locked. Place the Platform
Controls on the floor of the platform.
2. Remove and retain the set screws from the side guardrails and the slide-out deck guardrails.
3. Lower the slide-out deck guardrail completely.
4. Lower the rear guardrail until it rests on the stop screws.
5. Lower the side guardrails completely.
6. Raise the rear guardrail until the retaining pins engage. Remove and retain the stop screws and nuts
from the rear guardrail.
7. Pull the two retaining pins and lower the rear guardrail completely.
R
AISING
1. Raise the rear guardrail until the retaining pins engage.
2. Install the stop screws and nuts on the rear guardrail and torque to 42 N-m (31 ft. lbs).
3. Pull the two retaining pins and lower the rear guardrail until it rests on the stop screws.
4. Raise the side guardrails until the tops are level with the rear guardrail.
• Install the set screws
5. Raise the slide-out deck guardrail until the top is level with the side guardrails.
• Install the set screws
6. Hang the controller on the slide-out deck guardrail.
7. Torque all set screws to 42 N-m (31 ft. lbs).
W A R N I N G
!
Before operating machine, guardrails must be securely fastened in their proper position.
F
D
O L D
This procedure applies only to the X32 model for the purpose of passing through a standard double door-
way. Guardrails must be returned to proper position before using the machine.
F
D
OLD
OWN
1. Unhook the controller from the side guardrail and place it on the floor of the platform.
2. Pull the retaining pin on the front guardrail and rotate inwards.
3. Pull the retaining pin on the rear guardrail and rotate inwards.
4. Starting with the slide-out deck guardrails and then the outer guardrails, lift up on each guardrail and
fold inward.
E
RECTION
1. Starting with the outer guardrails and then the slide-out deck guardrails, raise each guardrail and drop it
down, securing it in the vertical position.
2. Rotate the front and rear upper guardrails outward and secure them to the opposite side guardrails,
using the retaining pins.
3. Hang the controller on the side guardrail.
Page 10
G
U A R D R A I L S
P
ROCEDURE
P
ROCEDURE
O W N G U A R D R A I L S
P
ROCEDURE
P
ROCEDURE
, X26
!
, X32
Operation
Operation Manual

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

X32509065309950322

Tabla de contenido