43
INSTALLATION
To be carried out by qualified personnel.
The system must be installed in an area free from corrosive vapours and must comply with the legal standards
in force regarding evacuation of combustion by-products. It is especially recommended that standards concerning
safety, construction and flue positioning be strictly observed.
SYSTEM START-UP
G Open windows and doors and do not light any naked flames.
G Bleed the air
G Check that there are no gas leaks (use soapy water or an equivalent product).
Before installing the boiler it is important to remove any impurities from the water supply pipes; use air or
inert gas.
Make sure that the boiler is suitable for the type of gas available to the user.