POSITIONING THE FOUNDATION BOX AND THE LEVER CONTROL
1. Depending on the dimensions, dig a suitably sized
foundation ditch (it is recommended to provide adequate
drainage in order to avoid water pooling).
2. Place the foundation box inside the trench, with the support
pivot aligned with the hinge axis.
3. Install a conduit for the electrical cables, and another for
drainage.
4. Embed the foundation box in concrete, ensuring it is level
and plumb.
WARNING: ensure that the concrete used is properly cured
prior to proceeding with the following steps.
5. Insert the control rod A over the foundation box supporting
pivot B.
6. Insert the ball E into the special hole after having greased it
7. Fix with a strong welding the wing of the gate on the release
lever C, then put everything on the driving bracket A in
correspondence of the hole
8. Grease the mechanism using the appropriate grease nipple D.
AND BLOCKING SYSTEM