en - Water demineralisation
Wall mounted FlowMeter / ConductivityMeter
The water quality display devices can be mounted outside the UG
70-60/80 unit on the wall.
A suitable wall bracket is supplied with the display devices.
For alternative installation the sequence of individual components
must be observed:
The display device is always connected behind the water deminerali-
sation cartridge, i.e. in the following order: water stopcock - non-
return valve with pipe aerator according to DIN EN 1717 - water
demineralisation cartridge - display device FM/CM - washer-
disinfector .
Electrical connection is made via a switched plug and socket.
Maintenance
The UG 70-60/80 unit should be serviced at the same time as the
washer-disinfector by Miele Service.
47