Electrical Work - Mitsubishi Electric Mr.SLIM PUHZ-ZRP100KA/2 Manual De Instalación

Ocultar thumbs Ver también para Mr.SLIM PUHZ-ZRP100KA/2:
Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 54

6. Electrical work

6.1. Outdoor unit (Fig. 6-1, Fig. 6-2)
Remove the service panel.
Wire the cables referring to the Fig. 6-1 and the Fig. 6-2.
► Except PEA-RP200, 250, 400, 500GA
L N
S1
S2
S3
For Power
For Power
► In case of PEA-200, 250
PUHZ-200, 250
► In case of PEA-400, 500
(No.1 Outdoor)
PUHZ-200, 250
(No.2 Outdoor)
PUHZ-200, 250
► In case of PEA-200, 250
10
S1
S2
S3
Indoor unit
Outdoor unit
Remote controller
Main switch (Breaker)
Earth
Fig. 6-1
PEA-200, 250
PEA-400, 500
T (
B
- 4
) 1
T (
B
- 4
) 2
► In case of PEA-400, 500
Fig. 6-3
ZRP100-250
Fig. 6-2
Termial block
Indoor/Outdoor connection terminal block (S1, S2, S3)
Service panel
Clamp
* Clamp the cables so that they do not contact the center of the service panel or the gas valve.
Earth terminal
Note :
If the protective sheet for the electrical box is removed during servicing, be sure to
reinstall it.
Caution:
Be sure to install N-Line. Without N-Line, it could cause damage to unit.
ZRP100-140V
L N
S1 S2 S3
ZRP100-250Y/P200, 250Y
L1 L2 L3 N
Power supply
Earth leakage breaker
Circuit breaker or local switch
LCD remote controller
Outdoor unit
Indoor unit
Power cable wiring
Indoor/outdoor connection wiring
Grounding
Main remote controller
Subordinate remote controller
Standard (Refrigerant address = 00)
Refrigerant address = 01
Refrigerant address = 02
Refrigerant address = 03
Refrigerant address = 14
Refrigerant address = 15
S1 S2 S3

Publicidad

Tabla de contenido
loading

Tabla de contenido