Pos : 17 /=== T echnisc he Dokumentation/C ORIO / D YN EO / MAGIO / PUR A/PURA LT /Inbetriebnahme - N etzs pannung,PURA @ 1\mod_1472203188618_18.doc x @ 9972 @ 1 @ 1
Filling
:
Maximum filling height:
the bath
Minimum filling height:
platform
Emptying
:
7.
Switch off the water bath at the mains switch.
8.
Disconnect the mains cable from the water bath.
9.
PURA 4 can now be distributed. The same applies to all
other baths:
10. Place a suitable receptacle for the bath fluid under the
drain opening. Unscrew the drain screw.
11. Empty the bath.
12. After complete draining, close the drain opening with the