Power Down Operation - Leggett & Platt Premium Serie Manual De Usuario

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

To lower the base to the fl at position during an electrical power outage, complete the following procedure:
STEP 1
Verify power is unplugged from electrical power source.
STEP 2
Locate (1) power brick (FIGURE 6) and (2) 9 volt batteries (not
included).
FIGURE 6
STEP 3
Install (2) 9 volt batteries in power brick (FIGURE 7).
FIGURE 7
UNDERSIDE OF
POWER BRICK
10
Prodigy™ 2.0 Adjustable Base Owners Manual 99301584-c

POWER DOWN OPERATION

POWER
BRICK
INSTALL (2) 9 VOLT BATTERIES
*BATTERIES NOT INCLUDED
BATTERY
COMPARTMENT DOOR
(push down and slide off
to remove)

Publicidad

Tabla de contenido
loading

Tabla de contenido