To lower the base to the fl at position during an electrical power outage, complete the following procedure:
STEP 1
Verify power is unplugged from electrical power source.
STEP 2
Locate (1) power brick (FIGURE 6) and (2) 9 volt batteries (not
included).
FIGURE 6
STEP 3
Install (2) 9 volt batteries in power brick (FIGURE 7).
FIGURE 7
UNDERSIDE OF
POWER BRICK
10
Prodigy™ 2.0 Adjustable Base Owners Manual 99301584-c
POWER DOWN OPERATION
POWER
BRICK
INSTALL (2) 9 VOLT BATTERIES
*BATTERIES NOT INCLUDED
BATTERY
COMPARTMENT DOOR
(push down and slide off
to remove)