Mounting The Monitor - Waeco PerfectView M170L Instrucciones De Montaje Y De Uso

Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 53

Mounting the monitor

6.3
Creating clean soldering joints
Proceed as follows to solder a cable to the original cables (fig. 7, page 5):
➤ Strip approx. 10 mm of insulation from the end of the original cable (A).
➤ Strip approx. 15 mm of insulation from the end of the cable to be connected (B).
➤ Wind the cable to be connected around the original cable and solder the two cables
together (C).
➤ Insulate the two cables with insulating tape (D).
Proceed as follows to solder two cables together (fig. 8, page 5):
➤ Strip the two cables (A).
➤ Place a shrink sleeve with a length of approx. 20 mm over the cable (B).
➤ Twist the cables together and solder them (C).
➤ Place a shrink sleeve over the soldered point and heat it briefly (D).
7
Mounting the monitor
7.1
Tools required (fig. 1, page 3)
For installation and assembly you will need the following tools:
Measuring ruler (4)
Centre punch (5)
Hammer (6)
Drill bit set (7)
Drill (8)
Screwdriver (9)
To make and test the electrical connection, the following tools are required:
Diode test lamp (1) or voltmeter (2)
Insulating tape (10)
Heat shrinking sleeve
Hot air blower (11)
Crimping tool (12)
Soldering iron (optional) (13)
Solder (optional) (14)
Cable bushing sleeves (optional)
Depending on the individual installation requirements you may require bolts, nuts, wash-
ers, self-tapping screws and cable binders other than those including in the scope of de-
livery.
32
PerfectView M170L

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

91021000002

Tabla de contenido