Colour of IH 210 wire
yellow/green
brown
blue
Connect the IH 210 to only two of the three phases. Verify that the
correct cicuit breaker is installed. See section 2.2 for circuit breaker
specifications.
4
Preparation for use
• Place the IH 210 in the horizontal position on a stable surface.
• Connect the mains plug to a suitable mains supply.
• For workpieces with an internal diameter (>135mm) large enough to fit
over the inductive coil, follow these steps:
- Place the workpiece over the inductive coil using appropriate
lifting equipment.
- For best performance, adjust the position of the workpiece so
that the inductive coil is in the centre.
- If the sliding yoke is not installed on the IH 210, follow the
steps shown in the illustrations at the beginning of this manual.
Remove the protective film from the bright underside of the
sliding yoke before the first use.
- Slide the sliding yoke to the right so that it completely covers the
top of both vertical supports.
• For workpieces that do not fit over the inductive coil, follow these steps:
- Choose the larger of the two yokes that fit through the internal
diameter of the workpiece.
- If necessary, remove the sliding yoke from the IH 210.
- Verify that the protective film has been removed from the
underside of the small yoke if it is to be used for the first time.
- Slide the workpiece onto the yoke that you have selected.
- Position the yoke on the IH 210 with the bright underside
resting evenly on the two vertical supports.
• If you will use TEMP MODE, plug the temperature probe into the
connector on the left side of the heater. Place the magnetic end of
the probe on the inner ring of the bearing or on the innermost
surface of the workpiece.
• Switch the IH 210 on using the power switch on the left side.
• Observe the self-test of the display and signal tone.
© simatec ag
Mains supply terminal
Protection earth (PE)
Phase 1 (L1)
Phase 2 (L2)
Induction Heater IH 210
23