Rail/Bike Mount Installation - Furrion FBS012NVP-BL Guía De Inicio Rápido Y Manual Del Usuario

Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 31
Installation

Rail/Bike Mount Installation

1.
Lift the bike mount lock and rotate counterclockwise until the bike
mount can be fully opened. (Fig. C and Fig. D)
Fig. C
2.
Select where you are going to mount your speaker and install the
bike mount onto the bike. (Fig. E)
WARNING: Make sure the bike mount is fully secured by rotating the
bike mount lock clockwise. The minimum diameter of the mounting
pole is 7/8" (22 mm), and maximum is 15/16" (33 mm).
3.
Align the strap mount installed under the speaker with the bike
mount base and pull the bike mount lock handle to fix the speaker
onto the bike. (Fig. F)
Fig. D
Fig. E
Velcro Strap Installation
Thread the velcro strap through the strap mount installed under the
speaker and wrap to the place you would like to locate your speaker.
(Fig. G and Fig. H)
NOTE: Make sure the Furrion logo is facing outside while wrapping the
velcro strap.
Fig. G
Fig. F
Fig. H
7

Publicidad

Tabla de contenido

Solución de problemas

loading

Este manual también es adecuado para:

Fbs012nvp-psFbs012nvp-sbFbs012nvp-op

Tabla de contenido