Descargar Imprimir esta página

CAMBRIDGE Fully Assembled Manual De Instrucciones página 6

Ocultar thumbs Ver también para Fully Assembled:

Publicidad

Fireplace Concrete Pad Construction:
Call 811 for information on underground utility marking. Select desired location and excavate
64" L x 58" W x 12" D area for concrete pad. Fill excavated area with approximately 6" of ¾"
clean gravel, compacting every 3". Frame remaining 4" with 2"x4" lumber to create a level pad
(be sure 2"x4" wood frame is perfectly level, front to back and side to side). See attached
drawing for details of steel reinforcement rod placement. Fill concrete tubes and 2"x4" wood
frame with a 4,000 psi strong concrete mix.
* Allow concrete pad to cure for 48 hours.
Construccion Concreta del Cojín de la Chimenea:
Llame al 811 para obtener informaci n sobre la utilidad de metro marcado. Seleccione la ubicaci
n deseada y excavar 64" de largo x 58" W x 12" D área de plataforma de concreto. Llene la zona
excavada con aproximadamente 6" de ¾" limpia grava, compactando cada 3". Marco restantes
4" con 2" x4"de madera para crear una plataforma de nivel. (Asegúrese de 2" x 4" marco de
madera está perfectamente horizontal, de adelante hacia atrás y de lado a lado) Véanse los de-
talles del dibujo para la colocaci n de varillas de acero de refuerzo. Relleno de concreto y tubos
de 2" x4" marco de madera con una mezcla de concreto 4000 PSI fuerte.
* Deje que la almohadilla para curar por un mínimo de 48 horas.
Cambridge Fully Assembled
5
Outdoor Fireplace

Publicidad

loading