Bergstrom FLEX POWER II Instrucciones De Montaje página 8

Ocultar thumbs Ver también para FLEX POWER II:
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

FLEX POWER II
EN
Assembly
recommendations
• Before starting assembly, please read instructions
and follow them during installation process.
• Use the adequate tools for each operation.
Electricity
• Disconnect ignition key.
• Disconnect battery before starting assembly.
• Make sure electric components are securely
connected, checking their correct fitting.
Piping
• Ensure the refrigerant conduit sleeves are secure
and do not come into contact with sharp or very hot
elements.
• Take particular care when making the boreholes
and cutting, making sure there is no damage to the
electric cables or the fuel conduits.
• All the couplings must be clean, applying a small
amount of the same oil as used for the compressor
before tightening them.
• Always tighten the couplings using 2 wrenches to
prevent any breakage.
Tightening torque (N.m)
Steel quality
Thread
8.8
M6/100
10
M8/125
22
M10/150
45
Tightening torque (N.m)
Coupling
3/8
1/2
5/8
Torque
10.9
13
10
30
13
61
17
Nut
Torque
5/8
15-17
3/4
15-17
7/8
24/27
Bore
Ø 4, Ø 8,5, Ø 11 Broaches
Wrench 13
Torx 30 Screwdriver
Scissors
Flexo-meter
Documentation included
Mounting instructions
Parts list
Fragile
Beware of cuts!
Electrical hazard
!
The installing personnel must have a sufficient
training in vehicles air conditioning.
!
Bergstrom shall not be responsible for breakdowns
or damages coming from an inadequate handling or
installation of the equipment or from modifications
and substitutions carried out without our express
and written authorisation.
!
The unit does not comply with ADR regulations.
8
Tools
1002476928
1002476929
Symbology
! Warnings

Publicidad

Tabla de contenido
loading

Tabla de contenido