Mitsubishi Electric SLZ-KF09NA Para El Instalador página 4

Ocultar thumbs Ver también para SLZ-KF09NA:
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

A
B
25/32
H
I
D
1
D Ceiling
E Rafter
F Beam
G Roof beam
A
B
A
B Ceiling
C
D
D
A
B
C
5-1/2
F
120°
G
2-3/4
E
J
A
B Grille
C
2
H
I
J Steel reinforcing rod
B
A
C
D
E
F
C
G
B
E
F
G Check using the Installation gauge
A
B Ceiling
C
D Ceiling opening dimensions
A
B Ceiling
C
C
screws which should be prepared locally.
A
B
C Detail drawing of fresh air intake
D Indoor unit
E Ceiling surface
structors and interior decorators should be consulted for details.
foundation for securing the ends of the ceiling board.
1
reinforcing members.
2 Ferroconcrete structures
Suspend the main unit as shown in the diagram.
2. Lift the unit to the proper height of the suspension bolts to insert the mounting
plate between washers and then fasten it securely.
Damage could result by failing to adhere to this range.
condensation may form and drip due to air leakage etc.
with water.
securely to fasten the main unit.
entering the main unit when the grilles are left unattached for a while or when the
10 mm tapping
F
G
H
I 4
10 mm Tapping screw
J Insulation

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Slz-kf12naSlz-kf15naSlz-kf18na

Tabla de contenido