Cleaning And Care Of The System; Assembly And Commissioning; Set Up Guidelines; Setting Up The Lift - Nussbaum JUMBO LIFT 3500 HFC Instrucciones De Servicio

Tabla de contenido

Publicidad

Specifications for the hydraulic hose lines:
• Normal specification:
6 years including 2 years storage time.
• Increased demands e.g. due to increased usage
times, e.g. multi-shift operation, short cycle times
and pressure impulses and large external and in-
ternal (due to medium) influences which signifi-
cantly reduce the lifetime of the hose lines:
2 year operation duration.
7.2

Cleaning and care of the system

A regular and expert clean helps retain the value
of the system.
Additionally, it can also be a pre-requisite for the
preservation of guarantee claims for any eventual
corrosion damage.
The best protection for the system is regular remov-
al of contaminants of any kind.
This includes above all:
• De-icing salt
• Sand, pebbles, earth
• Industrial dust of all types
• Water, also in connection with other environmen-
tal influences
• Aggressive deposits of all types
• Permanent humidity due to insufficient ventilation
As a rule: The longer road dust, salt, and other
!
aggressive deposits remain caked onto the sys-
tem, the more damage they will have.
The frequency of system cleaning depends, among
other things on the frequency of use, of system han-
dling, of workshop cleanliness, and the location of
the system.
Furthermore, the degree of contamination de-
pends on the time of year, the weather conditions
and workshop ventilation.
Under adverse circumstances, weekly system
cleaning might be required, however a monthly
cleaning may be sufficient.
• For cleaning, do not use high pressure washers
(e.g. steam cleaners).
Do not use any aggressive and abrasive materi-
als. Instead, use mild cleaners, e.g. a commercial-
ly available detergent and lukewarm water.
• Carefully remove all contamination with a
sponge, or if required with a brush.
• Make sure that there is no residue of the cleaner
on the system. These could lead to an increased
danger of slipping when moisture is present. So
rinse thoroughly with clean water until all residue
has been removed.
• Be sure that electric parts of the system, cables,
hoses, etc. do not come into contact with water.
• Dry the system with a cloth and spray it with a
spray wax or oil.
76
To encourage/accelerate the airing and/or
i
drying of foundation pits and lift parts, whenev-
er the load receiving fixtures are not in use for
a longer period of time, including overnight, lift
them out of the foundation pit.
8

Assembly and commissioning

8.1

Set up guidelines

• Lift set up is done by trained manufacturer per-
sonnel or a contract partner. If the operating
company has appropriately trained assemblers,
the system can also be set up by them. Set up is to
be done according to the assembly instructions.
• A standard system may not be set up in explosion
endangered spaces or wash halls.
• Before setting up, verify that there is a sufficient
foundation or make it according to the guidelines
in the foundation plan. The set up location must
be level and even. Foundations in open air and
spaces where winter storms or frost are to be ex-
pected, must have a foundation to frost depth.
The operating company is solely responsible for
the set up location.
• Provide an on-site electrical connection of 3 ~/N
+ PE, 400 V, 50 Hz, fuses with 16 A, slow. The con-
nection point is on the operating unit.
• To protect the electrical cable all cable conduits
are to be fitted with cable sleeves or flexible plas-
tic pipes.
• After successful lift installation and before first
commissioning, the operating company must
have the lift grounding conductors inspected on-
site according to IEC regulation (60364-6-61). An
insulation resistance test is also recommended.
8.2

Setting up the lift

Before setting up the lift, ensure that everything
possible is done to prevent accidents due to care-
less assembly. This includes, above all, the use of
safe auxiliary means (e.g. cranes, forklifts and a suf-
ficient number of people), diverse supports and a
sufficient barrier to prevent unauthorised access.
• Carefully remove the lift from the wooden crate
and check for damage.
• Position the lift according to the data sheet at the
desired set up location.
• Set up the unit, connect power supply.
i
The set up location of the operating unit can be
selected from two variants. Either in the drive-in
direction at the front right or left.
• Fill with hydraulic oil, the manufacturer recom-
mends a high value hydraulic oil with a viscosity of
32 cst. The required oil volume is approx. 14 litres.
After filling, the oil must be between the marks on
OPI_JUMBO LIFT 3500 HFC-HYMAX XX 3500 HFC_V2.4_DE-EN-FR-ES-IT