Operation With The Mobile Fertiliser Test Kit; Arranging The Collecting Trays; Checking The Set Working Width - Amazone ZA Serie Instrucciones De Servicio

Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 96
4

Operation with the mobile fertiliser test kit

4.1

Arranging the collecting trays

4.2

Checking the set working width

Mobile fertiliser test kit BAG0073.2 11.14
Place the collecting trays as follows on an even ground surface
(Fig. 1):
4 collecting trays parallel to the 1st tramline (F1) at a distance of
half a working width (1/2 F).
4 collecting trays in the 2nd tramline (F2).
1. Set the spreader to the desired working width according to the
setting chart.
Measure the mounting height of the fertiliser spreader from the sur-
face of the ground.
2. Travel along tramline F1 with the prescribed pto shaft-rev.
speed.
3. Before travelling along the tramline F2 check whether the col-
lecting tray II has collected fertiliser.
3.1 If not, only travel along tramline F2 (Fig. 1)
3.2 In the affirmative travel along tramline F2 and F3 (Fig. 2).
4. Pour the collected fertiliser of the collecting trays I and II into the
relevant funnel halves
5. According to the fertiliser level in the two funnel halves value the
fertiliser lateral distribution.
Operation with the mobile fertiliser test kit
en
27

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Za-mZa-vZa-m ultraZa-uZa-f

Tabla de contenido