Electrical Central Pump Jpe 30 Nvr / Jpe 30/4 Nvr - Jung JPE 30 NVR Instrucciones De Servicio

Bombas
Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 39

4.2 Electrical central pump JPE 30 NVR / JPE 30/4 NVR

7
OFF
ON
3
WARNING
If multiple jacks are connected, make sure that the load
is lifted/lowered evenly. There is a danger of tipping.
Injuries might occur.
NOTE
The needle valves are for regulating the amount of oil
to the jack, but not the oil pressure.
- 30 -
6
2
5
4
CAUTION
Work on the central pump only when it is de-energized
and unplugged.
CAUTION
Only connect and shut off hydraulic hoses on depres-
surized jacks and pumps. Not under load / in working
position.
Connecting the jacks
> Close the draining screws (2) of the jacks in the
clockwise direction.
> Draining valve (3) of the electrical central pump
again.
© JUNG Hebe- und Transporttechnik GmbH
2
Pumps
1
1

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Jpe 30/4 nvrJpe 55 nvrJp 26Jpl 15

Tabla de contenido