Installation And Connection Of The Unit - Medion MD 2867 Manual Del Usuario

Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 113
I
NSTALLATION AND CONNECTION OF THE UNIT
Before you connect the unit to the mains supply,
check the type of current and voltage at the
installation location with respect to the information
given on the manufacturer's nameplate.
After transport, leave the unit for 3 hours in an
upright position before connecting it.
The manufacturer is not responsible for
any incorrect installation or operating
errors. You will be charged for any
servicing costs resulting from such errors,
even during the warranty period.
GB
GB-9

Publicidad

Tabla de contenido
loading

Tabla de contenido