Operation Procedure - Toyotomi ETK-20E Manual De Instrucciones

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

OPERATION PROCEDURE

1
Insert the Power Pulg completely into the outlet to ensure proper contact.
1
2
2
To start operation, press the power switch to ON. The Air Blower Speed Lamp will light.
3
3
In order to switch the air blower speed, select "High" or "Low" with the Air Blower Speed
Switch. The air blower speed lamp will also be activated.
4
In order to stop operation, press the power switch to switch the unit off. The Air Blower Speed
4
Lamp will go out.
Fan Speed Lamp
ON/OFF Button
7

Publicidad

Capítulos

Tabla de contenido
loading

Tabla de contenido