Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

Coil ROTATION

If the bank must be turned to suit the plumbing system, proceed in the following way after having removed the front
panel (when installed):
1 . Disconnect the electricity main and make sure that no one is able to connect it again during the installation work.
2 . Remove the intake filter as illustrated in Fig.1 (version VM-B only)
3 . Remove the four screws (1-Fig.1) that fix the casing to the frame and take out the casing (version VM-B VM-F
only).
4 . Take out the following electric wiring components in sequence:
• Unscrew the ground bolt (1-Fig.2)
• Take out the terminal board (2-Fig.2)
• Take out the wire clamp (3-Fig.2)
• Take out the core hitch (4-Fig.2)
5 . Remove the screws that fix the condensation tray (5-Fig.2) and take out the tray.
6 . Remove the fixing screws from the top part of the frame (6-Fig.2) so that the side panels can be opened slightly.
7 . Remove the screws that fix the bank (7-Fig.2) and then take out this latter.
8 . Remove the pre-cuts (8-Fig.2) from the right-hand part and then close the connection through holes (of the bank
in its original configuration) on the left using adhesive anti-condensation tape.
9 . Turn the bank and fix it with the previously removed screws. Now screw on the top part of the frame.
10 .Position the condensation tray on the right-hand side, remove the right-hand drain plug spigot (9-Fig.2) and
positioning it in the left-hand one. Make sure that the plug is tight.
11 . Mount the control panel (if applicable) on the support with reference to the instructions supplied with the
accessory.
12 . Remove the plastic cover from the top left-hand side of the cabinet (version VM-B VM-F only) and fix it on the
right-hand side.
13 . Fit the casing back in place (version VM-B VM-F only)
14 . Fit the intake filter back in place (VM-B only)
15 . Hook up the electricity main again.
Fig. 2
INSTALLATION
35

Publicidad

Tabla de contenido
loading

Tabla de contenido