Vertical Discharge; Horizontal Discharge - Best P12 Manual Del Usuario

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

INSTALLATION

VERTICAL DISCHARGE

MOUNTING
STUDS

HORIZONTAL DISCHARGE

COVER
PLATE
MOUNTING
STUDS
1.
Attach ROUGH-IN PLATE to MOUNTING STUDS at inside,
top of hood with (4) existing #10-32 HEX NUTS.
COVER PLATE
HEX
NUTS
ROUGH-IN
PLATE
MOUNTING
STUDS
ROUGH-IN
PLATE
ROUGH-IN PLATE
MOUNTING
STUDS
2.
Remove wiring cover.
3.
Run power cable to installation location, remove knockout
from ROUGH-IN PLATE wiring box and connect cable to wir-
ing box using proper connector. Connect BLACK TO BLACK
(hot), WHITE TO WHITE (neutral) and GREEN OR BARE
WIRE (ground) under second ground screw. Replace wiring
cover.
4.
Run 10" round steel duct to installation location.
5.
Install 10" round damper (included) inside ductwork, at least
3" above mounting plate
HEX
NUTS
MODEL P12
Page 3
BLACK TO BLACK
WHITE TO WHITE
GREEN TO GREEN
OR BARE WIRE TO
GROUND SCREW

Publicidad

Tabla de contenido
loading

Tabla de contenido