2.14.2 Emptying Operations - Sime Brava Slim HE 25/55 ErP Manual De Instalación Y Mantenimiento

Calderas murales de condensación con calentador-acumulador
Ocultar thumbs Ver también para Brava Slim HE 25/55 ErP:
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

2.14.2 EMPTYING operations

Domestic hot water circuit (storage tank):
– close the domestic hot water circuit isolation valve
(prearranged in installation)
– connect a rubber hose to the tank drain valve (5) and open it
– when it has fully emptied, shut-off the tank drain valve (5).
Boiler:
– loosen the automatic bleed valve (4)
– close the heating circuit isolation valves (prearranged in
installation)
4
86
– check that the filling valve (3) is shut-off
– connect a rubber hose to the boiler drain valve (6) and open it
– when it has fully emptied, shut-off the boiler drain valve (6)
– close the automatic bleed valve (4).
5
Fig. 30
Fig. 31
EN
6
3
Fig. 32

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Brava slim he 30/55 erp81142168114218Brava slim he 25/55 erp

Tabla de contenido