Installation; Door Adjustment - Sub-Zero UC-24R Manual Del Usuario

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

INSTALLATION

Installation
CAUTION
Before moving the unit into position, secure the door
closed and protect any finished flooring.
Use an appliance dolly to move the unit near the opening.
If the unit has been on its back or side, it must stand upright
for a minimum of 24 hours before connecting power.
LEVELING
Level the unit before sliding it into position. Turn each of the
four leveling legs clockwise to raise the unit and counter-
clockwise to lower. Refer to the illustration below.
LEVELING LEGS
Leveling.

DOOR ADJUSTMENT

The top and bottom cabinet hinges are held in place with
three permanent adjustment screws. For adjustments,
loosen the screws, adjust the door and tighten screws.
Refer to the illustration below.
PLACEMENT
Plug the power cord into the grounded outlet and slide the
unit into position.
It may be necessary to install the unit
front surface of adjacent cabinetry to prevent interference
when the door is opened to 145°. Refer to the full-scale
template on page 11.
TOP DOOR
HINGE
ADJUSTMENT
SCREWS
Top door hinge.
1
/
"
beyond the
(6)
4
|
subzero.com
7

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Uc-24bgUc-24ciUc-24ro

Tabla de contenido