Step 2
Power supply pipe valve installation. Due to varying local
conditions, the valve provided by the manufacturer conta-
ins two reductions: ½" i ¾". Make sure that the tap water
is cut off and the water in the feeding pipe is not under
pressure. Also make sure that the demineralizer is fed by
cold water.
Step3
Connection sockets are located on the right side of the de-
vice: "FEED WATER", "DRAIN", "TANK". They are pro-
tected by caps. To remove a cap, press the quick-connector
ring and pull out the caps. Sockets to connect taps for I, II
or III purity classes are located on the left side of the device.
Step 4
Sediment prefilter with a 5 μm filter should be installed
between the demineralizer and the tap water connection.
Connect the prefilter by putting the cord into "OUT" prefilter
socket and "FEED WATER" demineralizer socket.
Step 5
Tank installation. Pick a suitable place for the tank and con-
nect it with the device to "TANK" socket.
57