Pitco Frialator SG 14 Manual De Instalación Y Operación página 7

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

c. While wearing protective gloves, use the fryer cleaning brush to scrub the inside of the fryer to remove
protective coating.
d. When cleaning is complete, turn off the fryer main burners and turn gas valve knob to the OFF
position. While wearing protective gloves, drain the water into a container suitable for hot water and dispose
of it.
e. When the tank has cooled, rinse it thoroughly with cool water. Continue to rinse the tank until the cleaner
has been rinsed, thoroughly from the tank.
f. Using a clean dry cloth, wipe out all of the water. Be very thorough removing the water, because any residual
water will cause hot oil to splatter out of the fryer.
Mild steel tanks must be wiped down/coated with oil to keep the tank from rusting.
g. Now that the tank is clean, you are ready to fill and operate the fryer.
Gas units installed with casters must have a restraining device. This device must be connected at all times
that the fryer is connected to the gas supply. If it is disconnected for any reason, it must be reconnected.
Filling the fryer with solid shortening
a.
Make sure the drain valve is completely closed.
b. Cut the solid shortening into 1" (2.54CM) sqare cubes andcompletely pack fry tank up to oil level mark with
cubes making sure there are no air pockets.
c. 1.
Solid State Thermostat: Switch melt switch to melt position. Turn the Thermostat
knob to desired temperature. Turn the power switch to the "ON" position.
(Note: if using solid shortening, set melt switch to the ON position)
2.
Digital Controller: Press the
(Note: if using solid shortening, ensure digital controller is programming is set on the solid
shortening melt cycle setting, by following digital programming instructions in
3.
Computer Controller: Press the
(Note: if using solid shortening, ensure computer controller is programming is set on the solid
shortening melt cycle setting, by following digital programming instructions in
d. Allow unit to heat to operating temperature, unit is now ready for use.
Filling the fryer with liquid shortening
a.
Make sure the drain valve is completely closed.
b. Fill the fryer with shortening up to the oil level mark indicated on the back splash of the fry tank.
Once the fryer has been filled with shortening, turn the unit ON and allow to heat up to set temperature.
THERMOSTAT CALIBRATION
R6
CAUTION
WARNING
button on the controller panel to turn fryer ON,
button on the controller panel to turn fryer ON,
5
manual)
manual)

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Sg 14rSg 14tSg 18Sg 18fSg 24pSg 24f ... Mostrar todo

Tabla de contenido