Connecting The Power To The Unit; Cabling Requirements - Ingeteam INGEREV CITY Wall Serie Manual De Instalacion Y Uso

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

Ingeteam
6.
Complete the attachment of the station by inserting two self-tapping screws from the inside in the
direction of the wall. Two plastic caps are supplied to cover the holes. Take them out and insert the
fastening elements.
7.
Check that the unit is properly secured.

7.2.2. Connecting the power to the unit

Cabling requirements

The connection must meet certain requirements:
Connection specifications
Connection type
Number of conductors
Rated current
Conductor maximum diameter
Connection process
1.
With the front door still down, open the metal plate that houses the electronic card for access to the
connection terminal block.
22
Plate
Single phase
2P + E
16 A
10 mm
(2 x 6 mm
2
ABA2020IQM01_A - Installation and Operation Manual
Installing and connecting the unit
Three phase
3P + N + E
up to 32 A
)
2

Publicidad

Tabla de contenido

Solución de problemas

loading

Tabla de contenido