Putting Into Operation - Hupfer OTA/47-36 Manual De Instrucciones

Ocultar thumbs Ver también para OTA/47-36:
Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 182
Transport, Commissioning, Assembly and Decommissioning

Putting into Operation

Step 1: Preparation
§
Prepare cut-outs in the worktop corresponding to the indicated dimensions.
The worktop cut-out dimensions are given in mm as shown in the drawing.
§
Remove the protective plastic film from the metal plates.
Step 2: Installation
Abbildung 7
§
Insert the appliance precisely into the worktop cut-out from above and fasten it.
§
If necessary, adjust the screw feet.
§
Put on the cladding.
4.3
Putting into Operation
Before the first use of the appliance, remove the protective plastic film from the metal plates.
INFO
Before putting the appliance into operation, it is necessary to check whether the appliance functions proper-
ly.
The following functions are to be checked separately:
§
In the mobile appliances: Function of the total brakes.
Ensure the appliance is clean and dry before it is put into operation.
4330041_A2
OTA/47–36 | OTA/53–37 | OTA/58-33 | OTA/53–37 S | OTA/U-BW | OTA-E/BA-4xGN | TAG-1/53-37 | TA-2/53-37 | EBS-T/53-37
Assembly instructions EBS-T/53-37
Disposal of packing material
The packing consists of recyclable materials and can be disposed of appro-
priately. Thereby, the different materials are to be separated and disposed in
an environmentally compatible manner. In any case, the local bodies respon-
sible for disposal are to be involved for this purpose
Chapter 4
Page 19
Tray dispenser

Publicidad

Tabla de contenido
loading

Tabla de contenido