2. Preparation
Symbols
2.1
GB
Note!
Measuring
Levelling
Measuring out
Drilling
Tightning
Manual operation
Shortening
2.2
Preliminary remarks:
•
Do not trail the top roller over the ground
•
During the installation, place the top
roller on a clean surface
2.3
The NovoSpeed Basic consists of the following main sections:
•
A top roller that consists of a door roller surrounded by a plastic door panel (cloth).
Two columns that support the top roller and guide the door panel.
•
•
A cabinet with the control box.
•
A box with further small parts.
•
When installing multiple doors you must carefully sort all components!
•
Report any transport damage immediately to Novoferm Netherlands BV.
+ NOTe! +++ NOTe! +++ NOTe! +++ NOTe! +++ NOTe! +++ NOTe! +++ NOTe!+++ NOTe! +++ NOTe! +
4
Forklift truck
Lubricating
Cutting
Reading
Clips
Safety helmet
Ty-Rap
, etc. Installation sequence
➀➁➂
•
Do not step on the cloth (door panel)!
•
The following instructions apply to
standard NovoSpeed Basic doors
2.4
?
BOX
1 ### ###
2 ##### #
3 #### ##
4 ### ###
5 #### ##
6 ### ###
Ensure that the correct parts have
been supplied. When installing
multiple doors make sure to sort
everything carefully.
2.6
B1
B2
B3
B1 = B2 = B3?
Check the breadth
of the standard opening.
2.8
OK?
Check that lintel and frames
are straight and level.
2.5
Make sure that the work area is
adequately cordoned off.
2.7
H1
H2
H3
200
200
v
v
H1 = H2 = H3?
Check the height
of the standard opening.
2.9
HL = HR?
HR
HL
Check that the
floor within the
range of the door
smooth and level.
GB
5