4.6.
The power cable provided by ECOFOREST is 1.4m long; you might need a longer one. Always use a cable with
ground plug and with an equal or greater section. Make sure the power cable is not placed under the stove
or close to hot or sharp surfaces that could damage it.
4.7.
Remove the packaging and the protective plastic.
4.8.
Remove the screws or bolts that fasten the stove to the pallet and remove it.
4.9.
If our model has a plastic protection, it must be removed before starting it.
4.10. Remove exhaust blower protection.
MATERIAL
Stainless steel pipe (AISI 316L).
Aluminum, galvanized or iron
pipe.
Insulated double wall pipe.
T with outlet.
Clamp union.
Pipe anchors.
Aluminium belt and silicone of
high temperature (300°C).
Pressure gauge.
Expansion vessel.
Buffer tank.
Electrolytic sleeve.
UNPACKING THE BOILER.
Drawing 3
MATERIALS REQUIRED FOR INSTALLATION
COMPLIANCE
OBLIGATORY
PROHIBITED
OBLIGATORY
RECOMMENDABLE
OBLIGATORY
OBLIGATORY
OBLIGATORY
RECOMMENDABLE
RECOMMENDABLE
OBLIGATORY
RECOMMENDABLE
RECOMMENDABLE
30
PARTICULARS
ALL.
ALL.
Proximity to flammable materials.
When crossing a forge or partition.
Outdoor or brick-built chimney installation.
Relative ambient humidity ≥ 60%.
Installation in a public facility.
Potentially accessible to children or people with
mental, physical or sensory disabilities.
ALL.
Install the exhaust spiral and gas outlet pipes,
thereby preventing anyone from disassembling
or moving the stove or pipe without tools.
Install the pipe, thereby preventing anyone from
disassembling or moving the stove or pipe
without tools.
If the pipe is not equipped with sealing rings
To compare the pressure of the circuit with
which the boiler indicates.
If the stove's expansion tank is not big enough
according to specific calculations.
Installation of special features such as radiant
floor, areas operated by thermostatic valves,
other stoves working in the same site, etc. The
device must be fitted with a buffer tank for
proper regulation.
Depending on the material used for the hydraulic
circuit.