5.2
FIXING THE BARRIER TO THE GROUND
HARRIER must be mounted on a fl at, solid surface; therefore it is necessary to prepare a concrete base for it (fi g.4).
!
Warning
The base must be horizontal, do not use any other type of mounting.
fig.4
Level
Electrical cable
conduits
30 mm
Base plinth
PREPARING THE BARRIER SUPPORT MOUNTING AND BASE
- 19 -
Prepare a base plinth, complete with 2 fl exible cable
conduits (min. diameter 30 mm) for the electrical
cables.
IMPORTANT: The plinth surface must be perfectly level,
and raised above ground level by 20 mm.
Sink four tie bolts, capable of securing the barrier
frame, into the concrete.
IMPORTANT: the tie bolts must protrude by at least
40 mm.
n.b.:
An alignment plate,
complete with 4 tie
bolts, can be used for
this purpose (this is
an option and must be
purchased separately).
Position the barrier frame, lining it up with the 4
bolts, and secure it in place using 4 nuts.
IMPORTANT: Ensure that the barrier frame is mounted
horizontally, by adjusting the nuts and locknuts.
Installation