II. Thermostatic compact cartridge, see fold-out page II,
Fig. [4] and fold-out page III, Figs. [13] and [14].
1. Remove screw (H) and detach lid, see fold-out page II,
Fig. [4].
2. Remove screw (I), see fold-out page III, Fig. [13].
3. Detach plug (J1) and remove servo motor (J).
4. Loosen screw ring (K) using a 34mm tool and remove.
5. If necessary remove and change thermostatic compact
cartridge (M).
6. Assemble the thermostatic compact cartridge (M) in
reverse order.
Observe the correct installation position of the
thermostatic compact cartridge (M), see detail (M1).
7. Connect plug (J1) to servo motor (J). Do not install servo
motor (J) on thermostatic compact cartridge (M) jet. This
must be done later, see point 12.
8. Connect the voltage supply and open the cold and hot
water supply.
9. Wait 3 minutes until the system is initialized.
10. Open solenoid valve (N) with digital controler.
11. Turn regulating nut (L) until 100 °F is reached.
12. Install servo motor (J), cams (J2) must be positioned one
above the other, see Fig. [14].
Fault
Cause
Water not flowing
• Water supply interrupted
• Plug-in connector without contact or no
voltage supply
Flow rate too low
• Functional unit not adapted to local
conditions
Water too cold/hot
• Functional unit not adapted to local
conditions
No function
• No voltage supply to functional unit
• Digital controller not ready
• Digital controller not registered
Digital controller/
• Digital controller/diverter out of range
diverter flashes white
• Unit battery discharged or incorrect
inserted
Lower segment flashes
• Temperature too high
1x green
• Software malfunction
Lower segment flashes
1x yellow
• Hard- or software malfunction
Lower segment flashes
1x red
5
English
III. Check valve (E), see fold-out page III, Fig. [13].
1. Remove the screw plug (D).
2. Remove the check valve (E) and filter (F).
IV. Solenoid valve (N), see fold-out page III, Fig. [15].
Detach plug (N1), remove clip (N2) and remove solenoid
valve (N).
Assemble in reverse order.
Service
In the event of problems with installation, please switch
off the voltage supply and consult a specialist installer
or the GROHE Service Hotline via email at
TechnicalSupport-HQ@grohe.com.
Replacement parts
See fold-out page I (* = special accessories).
Disposal instructions
This category of device does not belong in the
domestic waste, but must be disposed of
separately in accordance with the relevant local
national regulations.
Dispose of batteries in accordance with national
regulations.
Remedy
- Open shut-off valves, isolating valves
- Attach plug-in connectors and connect voltage
supply
- Calibrate functional unit, see section F2 -
Calibrate
- Calibrate functional unit, see section F2 -
Calibrate
- Connect voltage supply via power supply unit
- Insert batteries
- Register new main digital controller or add additio-
nal digital controller, see section F3 - Register
- Check or change position of transceiver
- Check installation or replace unit battery, see
section Final Installation
- Check cold an hot water supply
- Wait until feeler gauge is cooling down
- Calibrate functional unit, see section F2 -
Calibrate
- Switch off the voltage supply and consult a
specialist installer or the GROHE Service Hotline
- Switch off the voltage supply and consult a
specialist installer or return the product to GROHE