i
I
(
2 det.1-2) Insert the glass panel in the compensator.
Make sure not to scratch the surface of the shower tray.
I
Check the distance (15 mm).
NOTE: if the multi-function panel is to be installed, fol-
low the instructions contained in the chapter in as-
sembly and positioning of the multi-function panel.
Installation of fixed glass panel "B"
i
I
(
2) Mark on the tray the distance for fastening the glass
panel, 15 mm.
i
I
(
2 det.1-2) Insert the glass panel in the compensator.
Make sure not to scratch the surface of the shower tray.
I
Check the distance (15 mm) (referred to the edge of the
tray).
Installation of the door (if included)
i
I
(
3 det.1) Insert the vertical gasket on the hinged side
of the door.
(det.2) Position the plastic blocks without double-face tape
under the door.
(det.3) Fasten the handle to the door.
i
I
(
4 det.1) Remove the threaded pins from the hinges.
(det.2-3) Set the door alongside the glass panel. Match the
hinges of the door with those of the glass panel. Put the
threaded pins back in place. Make sure the door rests on the
tray by means of the blocks.
Levelling of fixed glass panels.
i
I
(
5 det.1-2) Align the glass panels with the profile of the
tray. Level glass panels. Make sure the doors close correct-
ly. (det.3-4) If necessary, insert the transparent plastic wedges
(included) to compensate for any cracks which may have oc-
curred between the shower tray and the glass panel, in order
to ensure a constant distance of 15 mm between the lower
side of the door and the tray.
(det. 5-6) Remove the strip of the double-face tape from the
plastic blocks and position them as shown.
WARNING! The transparent plastic wedges come in
various sizes. Use the most suitable dimension to
compensate for any cracks.
Fastening of glass panels
i
I
(
6 det.1) After checking that the glass panels are
aligned and level, mark the points for drilling as described by
the dimensions shown in the table.
(det.2) Check that the magnets close perfectly. If they do not,
use a wood block and a rubber mallet on the profiles to re-
align the magnetic gaskets.
The diagrams represented in line "X" refer to installation of
the tray under the tiles. Those in "Y" refer to installation of
the tray with a finished wall. Column "A" describes instal-
lation with walls that are perfectly straight and squared.
Column "B" describes walls that are not square and s-
traight (maximum admissible error 10 mm).
Drill holes in the profiles of the glass panels and the compensators,
and fasten them with the screws. Insert the screw covers.
The installer may decide the position of fastening. Howev-
er, it is advisable to use three, as shown.
Installation of "sail" glass panel (Walk In)
Installation of fixed glass panel (160x90 Double)
i
I
(
7 det.1-2) Insert glass panel "A" in the other glass pan-
el "B". Make sure that the two aluminium profiles connect
perfectly. If necessary, use a rubber mallet.
Installation of tubes to hold glass panels in place
(versions without multi-function panel)
NOTE: if the multi-function panel is to be installed, fol-
low the instructions contained in the chapter in as-
sembly and positioning of the multi-function panel.
i
I
(
8 det.1-2) Insert the glass panel support at the ends
of the tube (B). Turn, but do not tighten, the headless screw.
(det.3-4) Insert the connection cylinder in hole. Fasten the
cylinder to the tube (B).
(det.5-6) Insert the tube (C) and tighten the headless screw.
(det.7-8) Insert the glass panel at the end of the tube (C).
Turn, but do not tighten, the headless screw.
(det.9) Referring to the corresponding dimensions, place the
support tube and mark the point for drilling a hole in the wall.
(det.10) Drill and insert the plug.
(det.11) Put the support tube back in place and secure it with
the screw with washer.
(det.12) Insert the assembled tube (B-C) in the support and
on the glass panels. Check the correct position of the two sup-
ports cut into the glass panels.
(det.13-14) Turn, but do not tighten, the headless screw.
(det.15) Align and level the glass panels. Also check align-
ment of the tube (C) with the hole of the glass panel.
(det.16-17) Tighten all of the headless screws. Place the hole
plugs.
Walk in
i
I
(
9 det.1-2) Insert the intermediate glass panel support (D)
at the ends of the tube (B). Turn, but do not tighten, the headless
screw.
(det.3-4) Insert the connection cylinder in the hole. Fasten
the cylinder to the tube (B) using the screw.
(det.5-6) Insert the tube (C) and tighten the headless screw.
(det.7-8) Insert the glass panel at the ends of the tube. Turn,
but do not tighten, the headless screw.
(det.9) Referring to the dimensions, place the support tube
and mark the point for drilling a hole in the wall.
(det.10) Drill and insert the plug.
(det.11) Put the support tube back in place and secure it with
the screw with washer.
(det.12) Insert the assembled tube (B-C-D) in the tube sup-
port and on the glass panels. Check the correct position of
the two supports cut into the glass panels.
i
I
(
10 det.1) Level the glass panels. Also check alignment
of the tube (C) with the hole of the glass panel.
(det.2-3) Tighten the headless screws. Place the hole plug.
(det.4) Tighten the headless screw.
(det.5) Check the 90° angle.
(det.6-7) Now adjust and tighten the headless screw.
12