6 INSTALLATION

The stove must be installed by quali¿ ed personnel in compliance with EN 10683.
6.1 LEVELLING THE STOVE
The stove must be levelled by adjusting the feet (where featured), then checked
using a spirit level (Fig. 6.1).
A B = Spirit level
6.2 SYSTEM CONNECTIONS

6.2.1 Electrical connection

The stove is connected to the electrical system simply using the plug supplied.
The electrical connection (plug) must be easily accessible when the stove is installed.
If the power cord is damaged it must be replaced by the technical service or a
quali¿ ed technician, to prevent any kind of risk.
6.2.1.1 Earth
The system must be earthed and ¿ tted with a residual current circuit-breaker in
accordance with legislation in force (Fig. 6.2).
The À ue must have its own earth connection.
6.2.1.2 Room thermostat
The thermostat is connected to the appropriate inputs of the circuit board, as shown
in the wiring diagram in the attached "Product Manual".
6.2.1.3 Remote device (only for models where ¿ tted)
The remote device is connected to inputs 1 and 2 on terminal block CN7 on the
electronic board. (only in the board where terminal block CN7 has 10 inputs)
The device must be con¿ gured as NORMALLY OPEN and have an adjustable
differential.
When activated (contact opens) the stove will be switched off or on.
After installing the remote device, the stove must be started the ¿ rst time from
the control panel.
6.2.2 Connection to an air distribution system
(only for ducted models or provided with ducting kit)
Ducted models can be connected to a hot air distribution system. The pipes used
should preferably be circular with a smooth inner surface and suitably insulated to
avoid heat loss.
For ducted stoves or models ready to ¿ t a ducting kit that are not connected
to a hot air distribution pipe, make sure the deÀ ector is positioned so as to
deviate the hot air into the room where the stove is installed.
D
UCTED STOVES
Using the tool supplied or the air deÀ ector lever (based on the model), the À ow of
hot air can be deviated from the room where the stove is installed to the ducting,
and vice-versa (Fig. 6.3).
To connect the stove to the ducting system, remove the cap by unscrewing the two
fastening screws that secure the duct closure cap on the rear of the stove (Fig. 6.4).
S
TOVES READY TO FIT A DUCTING KIT
To assemble the ducting kit see the instructions provided with the kit.
The À ow of hot air can be deviated from the room to the ducting using the tool
supplied with the kit to adjust the deÀ ector control located on the front of the stove.
42/144
INSTALLATION
INSTALLATION MANUAL
- cod. 004770810 - 09/2011 - Palazzetti - PN - Italy
Fig. 6.1
Fig. 6.2
Fig. 6.3
Fig. 6.4