Installation
2-2
Connect the input plug to your facility's
compatible AC power source.
2-3
Connect your equipment's input plugs to
the appropriate outlets on the PDU. The
LED near each outlet illuminates when
the outlet is ready to distribute live
AC power.
Note: It is recommended that you do not
connect a live load to the PDU. If the load you
intend to connect has an ON/OFF switch, please
turn the switch to OFF prior to connection.
2-4
Optional Cord Retention Procedure
Option 1 (Select Models): Use
5
6
the bridge lances located near each
4
LOAD L2
receptacle to retain power cords. Tie
BANK 1
each equipment power cord to a bridge
lance by looping the cord and securing
it with one of the included cable ties
Make sure each cord can be unplugged
from the PDU without removing the
cable tie.
Option 2: Use the included C14 and
C20 plastic sleeves to secure plugs to
receptacles. Attach the sleeve to the
plug, making sure that the pull tabs
remain outside the plug and that the fit
is secure. To unplug equipment properly,
use the pull tabs to remove the plug
and sleeve from the receptacle.
Hardwire Installations
(PDU3XVSRHWA & PDU3XVSRHWB models only)
2-5
These models do not come equipped
with an input cable. Conduit and
adapters are installed to the endplate
wires are channeled through the conduit
and adapters to the terminal block,
located behind the access plate
13-09-017-9332B8.indb 6
LOAD L2
LOAD L3
BANK 1
BANK 1
WARNING
Only qualified personnel should perform hardwire installations. Wire codes and
requirements differ from area to area. Be sure to conform to local electrical
requirements.
2-2
B3
9
7
8
2-3
.
A
B
2-4
A
,
A
.
B
2-5
6
For Installation
Purposes Only
11
12
10
B4
A
B
B
9/5/2013 4:26:49 PM
ENVIR
LOAD L1
BANK 2
CONFIG