1. Prior to pole installation and goal assembly, call utility services for location of underground utility lines before you dig.
2. Vertical main post assembly is a two part process.
Day 1.
Post assembly, pour concrete, set post and
Allow concrete to cure.
Day 2.
Allow concrete to cure.
POST INSTALLATION INSTRUCTIONS (Day 1)
Before digging hole for your system, check for
buried power, gas, water, and telecommunication
lines! Failure to do so could result in serious or fatal
injury! Contact your local utility company if unsure.
ITEMS NEEDED (not included)
50 lbs bags of concrete
9-
1-
Post hole digger (optional)
1-
Wheel barrow
1-
Garden hose
1-
Level
Tape Measure
1-
6-
2X4's
50 lbs sand bags
2-
1-
Standard masonry block
9/16", 3/4" & adjustable wrench
1-
1-
Cordless drill & 9/64" drill bit
5/16" socket driver (for cordless drill)
1-
1-
Pair of Safety Glasses
Phillips Screwdriver
1-
1-
Ladder
Note: For best results with less vibration, your system
should be independent of court. If pouring concrete for
both at same time, add an expansion joint in between.
Note: When digging hole, if you hit rock
and cannot dig through contact a contractor.
1.
Determine the location of the hole.
The proper location is as close to the
court without making contact, as
shown in Figure 1. This,
however, is a general rule.
If you need to locate the
hole in a location other than this, use
the following dimensions as a guide.
Overhang when adjusted to 10 ft. = 14"
Note: Minimum of 18" rear clearance is required behind pole.
2.
Dig a round hole 32" deep and 16" in diameter at
the top and 20" in diameter at the bottom of the hole.
If you live in an area where frost heaves may pose a
problem, consult your local building inspector to
determine the proper hole depth. See Figure 1.
INSTALLATION TIMELINE
PART 1
Day 3.
Complete Silverback
3-4 adults)
Figure 1

Top View

Court
Hole must be close to
the Court without
making contact.
3. Place and center a masonry block in the bottom of the
hole so there is exactly 16" from the playing surface to
the top of the masonry block. See Figure 2.
18 INCH
MINIMUM
REAR
CLEARANCE
REQUIRED
Figure 2
4
PART 2
®
assembly instructions. (Requires
Diameter
Court Level
32"
20" Diameter
Court
Hole
Hole
Masonry
Block