Install The Chain/Cable - Craftsman 139.5398511 Manual Del Propietário

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

ASSEMBLY
STEP
4
Install
the
Chain/Cable
1. Pult the cable around the idler pulley and toward
the trolley.
2. Connect the cable to the retaining slot on the
trolley, as shown (Figure 1):
• From below, push pins of master link bar up
through cable link and trolley slot.
• Push master link cap over pins and past pin
notches.
• Slide clip-on spring over cap and onto pin
notches until both pins are securely locked in
place.
3. With the trolley against the pliers, dispense the
remainder of the cable/chain along the rail toward
the motor unit into the stot on the chain spreader,
around the sprocket onto the chain spreader and
continuing to the trolley assembly. The sprocket
teeth must engage the chain (Figure 2).
4. Check to make sure the chain is not twisted, then
connect it to the threaded shaft with the remaining
master link.
5. Thread the inner nut and lock washer onto the
trolley threaded shaft (Figure 3).
6. insert the trolley threaded shaft through the hole in
the trolley. Be sure the chain is not twisted
(Figure 4).
7. Loosely thread the outer nut onto the trolley
threaded shaft.
8. Remove the locking pliers.
Chain
2
Spreader
r'lgure
"u" Bracket
Bolt
Motor Unit
To avoid possible SERIOUSINJURYto fingers from
moving garage door opener:
• ALWAYSkeep hand clear of sprocket while operating
opener.
• Securely attach chain spreader BEFORE operating.
Dispensing
Carton
Leave Chain and Cable
Inside Dispensing
Carton to Prevent Kinking.
J
Keep Chain and Cable
Taut When Dispensing
Figure 1
i
I
i
i
Master Link
Clip-On Spr_
Master
:
Link Cap
Clip_On Spring _
Master
, '
Link Cap
,
I
Link
i
i
s
i
Trolley
: :
ed
I
,
Threaded
: I
Pin
Shaft
i
:
Notch
'
Master r
P u IIeY_-,/_J_
f
Hole
Figure 3
Trolley
Threaded
Shaft
Inner Nut
.-"
Lock
5/16"
Washer
5/16"
Figure 4
Hole
lO

Publicidad

Capítulos

Tabla de contenido
loading

Tabla de contenido