Ingeteam
7. Installing the unit
Before installing the unit, you must remove the packaging, taking special care not to damage the housing.
Check that there is no condensation inside the packaging. If there are signs of condensation, the unit must not be
installed until you are sure it is completely dry.
All installation operations must comply with current regulations.
All operations involving moving heavy weights must be carried out by two people.
7.1. General requirements for installation
•
The environment of the unit must be appropriate and meet the guidelines described in Chapter "6.
Preparation for installing the unit". Additionally, the parts used in the rest of the installation must be
compatible with the unit and comply with the applicable legislation.
•
Ventilation and the space for work must be suitable for maintenance tasks according to the applicable
regulations in force.
•
The external connection devices must be suitable and sufficiently close as set forth in current regulations.
•
The feed cables must be of the appropriate gage for the maximum current.
•
You must take special care to ensure that there are no external elements near the air inlets and outlets
that obstruct proper cooling of the unit.
7.2. Attaching the unit to the wall/support
These units have a system for securing them to the wall or support using a plate. The steps for fixing the unit
properly are as follows. The weight of the unit must be taken into account.
1.
Mark the fixing points for the plates on the wall.
2.
Drill holes in the wall or support with a suitable bit for the fastening elements to be used to secure the
plate to the wall later.
3.
Fix the plate using fastening elements that are appropriate for the wall or support onto which it is to be
installed. The diameter of the holes of the plate is 7.5 mm.
4.
Suspend the unit from the plate by fitting the slats in the openings on the back of the unit.
5.
Check that the unit is properly secured.
Once the unit has been installed correctly, the connection process will begin.
Make the connections in the following order:
1.
Connection of the auxiliary power and ground connection.
2.
Connection of the measurement transformer signals.
3.
Communications Connection
It is mandatory to follow the order described above. Do not power the unit´s internal circuits until all
connections have been made.
7.3. Opening the housing
In order to access the unit´s interior, open the door by previously releasing the locks with the corresponding key.
After making the different connections explained in the sections below, close the unit before starting it. In order to
close the housing, re-block the door by locking them with the corresponding key.
Check that the unit is correctly closed before starting up the unit.
18
ABP2011IQM01_ - Installation and Operation Manual
Installing the unit