InTrac 785 / 787
5
Operation: Inspection work
1. Visually check fastenings (ring nut, flange, NPT thread)
of the housing at the process connection for firm sealing
and leaks.
2. If necessary, check the condition of the electrode / sensor
(refer to sensor instruction manual for cleaning and
calibration procedures).
3. Calibrate / clean the electrode / sensor if necessary (refer
to sensor and transmitter instruction manuals).
6
Maintenance
1. Ensure the housing is fully retracted and in the "service"
position.
2. Isolate the pipe / tank / vessel etc. from the housing
(depressurize, empty, rinse, purge and vent, etc.).
3. Remove the sensor from the housing.
4. Remove t he r etractable h ousing f rom t he p ipe / tank / vessel
etc. (if changing of housing seal is needed).
5. Change the housing seal.
6. Calibrate / clean the electrode / sensor with reference to
sensor and transmitter instruction manuals.
7. Follow the installation and commissioning procedure.
7
Disposal
It is the user's responsibility to dispose of the housing in
a professional manner and in accordance with local
regulations.
8
Warranty
On manufacturing defects, 12 months after delivery.
9
Storage condition
We recommended following the shutdown procedure as
described in the housing instruction manual. The cleaned
and dried housing should be stored at room temperature.
10 EC Declaration of Conformity
The complete declaration is available in the declaration of
conformity certificate
InTrac is a registered trademark of Mettler-Toledo GmbH in Switzer-
land, the USA, the European Union and a further five countries.
© 07 / 2019 Mettler-Toledo GmbH
Printed in Switzerland
en
13
InTrac 785 / 787
30 313 391 B