Swing-N-Slide Alpine PROJECT 611 Manual De Instrucciones página 116

Ocultar thumbs Ver también para Alpine PROJECT 611:
Tabla de contenido

Publicidad

PROJECT 613 • PROJECT 614
614
614
613
613
2'' x 4'' x 74''
(Left Side)
(1) 2'' x 4'' x 23-1/4''
2'' x 4'' 19-3/4''
57 1/2
54
41 7/8
2'' x 4'' 19-3/4''
29 3/4
17 5/8
5 1/2
EXA MPL E OF LAD DER R UNG I NSTA L L ATI ON
Fig. 31
• BOTTOM OF LADDER RAIL •
(3)
2-1/2'' screws/nails
each side
(2)
2-1/2'' screws/nails
each side
2-1/2'' or 10D
screw/nail
Fig. 29
(4) 2'' x 4'' x 20-1/4''
TOP
(2) 2-1/2'' Screws/Nails
2'' x 4'' 22-3/4''
(2) 2-1/2'' Screws/Nails
(2) 2-1/2'' Screws/Nails
52 3/8
(2) 2-1/2''
Screws/Nails
40 1/4
28 1/8
(2) 2-1/2''
Screws/
Nails
16
2'' x 4'' 19-3/4''
3 7/8
3-7/8''
(6)
1-1/4''
/nails
screws
BACK OPENING
OPTION 1
(Front)
23 1/4
52 3/8
O. Ladder Assembly.
1. On ladder rails, mark all measurements locations for
each side with a pencil. Draw an angle line
connecting measurements for each ladder rung
allignment. (Fig. 29)
2. Align top of step bracket with line and screw in
place. Install a ladder rung at each of the five
locations. (Fig. 29, 30) Repeat on other ladder
rail.
3. Attach 2'' x 4'' x 23-1/4 to siderails using
(2) 2-1/2'' screws/nails per side.
4. Secure ladder to unit. (Fig. 31) Note: The top step
should be 11" below the deck and all steps should
be level.
5. Screw (2) 2-1/2" screws/nails into the ends of each
ladder rung through the left and right side rails.
(Fig. 31)
44
2'' x 4'' x 74''
(Right Side)
(1) 2'' x 4'' x 23-1/4''
(4) 2'' x 4'' x 20-1/4''
(2) 2-1/2'' Screws/Nails
(2) 2-1/2'' Screws/Nails
(2) 2-1/2'' Screws/Nails
(2) 2-1/2''
41 7/8
Screws/Nails
40 1/4
29 3/4
28 1/8
17 5/8
16
(2) 2-1/2''
Screws/
Nails
5 1/2
Fig. 30
3 7/8
(6) 1-1/4'' screws
or 4D nails
57 1/2
54

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Alpine project 612

Tabla de contenido