Fig. 4
(3) 2-1/2'' screws/nails
(4) 2-1/2'' screws/nails
(1) Lag Screw
A. Frame Construction (cont.)
6. Attach lower 5/4'' boards as shown in (Fig. 4).
Edges are to be flush with 4'' x 4''s.
A. Frame Construction (cont.)
5. Attach upper 2'' x 4'' as shown in (Fig. 4). Edges
are to be flush with 4'' x 4''s.
2'' Lag screw
2-1/2'' or 10D
screw/nail
13