(3) 2-1/2''
(4) 2-1/2'' screws/nails
(1) Lag Screw
Fig. 6a
2'' Lag screw
x 3
7. Secure upper 2'' x 4'' and lower 5/4''
Double check to make
sure structure is square
(6)
2'' lag screws
(3 each Cup-Loc)
8. Install 4'' x 4'' beams as shown in (Fig. 6).
9. Install lag screws at each corner location as
shown in (Fig. 6a)
14
boards to Frame 2 as shown in (Fig. 5).
Fig. 6