Fig. 19a
Bottom Beam Clamp
(4) 1-1/4'' screws
J. Swing Beam Drill Locations
1. Tap T-nut into 3/8'' hole as shown in (Fig. 19a)
Note: If using Laminated Swing Beam, make sure t-nut teeth do not fall between seams of 2'' x 6''s.
2. Place a bottom beam clamp over the swing hanger as shown in (Fig. 19a)
3. Insert the swing hanger into the beam and thread it into the T-nut until it is flush or near flush with the top of the
T-nut. A screwdriver may be used to twist the hanger (Fig. 19a). Orient swing hanger as shown in (Fig 19a).
4. Use (4) 1-1/4'' screws/nails to secure beam clamp.
5. Check hanger to ensure it does not spin.
6. Repeat for all four hangers.
T-nut
t-nut
or 1-1/2'' nails
Hammer
3/8'' hole
Use Screwdriver to aid in tightening
Swing Hanger
24