Crane PROSSER SED Serie Manual De Instalación Y Operación página 11

Bombas sumergibles para extracción de agua
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

F-3.3) Wiring Connections:
Check power cable (12), for cracks or damage and replace
if required (see Figure 6). Place parts (12b, c & d) on power
cable (12a). Bring cord sets (12) through openings in top of
motor housing (11) and reconnect motor leads to power cable
(12) using connectors (19), and in addition use (38) for three
phase units, as shown in Figure 7. Attach ground wire to
motor with screw (20).
F-3.4) Cable Assembly:
Power Cable- Make wire connections as outlined in
paragraph F-3.3. Refi ll with cooling oil (if it has been drained)
as outlined in paragraph F-1.3. Insert one friction ring (12c),
grommet (12d), another friction ring (12c) into motor housing
(11). Apply pipe sealant to gland nut (12b) and screw into
motor housing (11). Torque gland nut (12b) to 15 ft. lbs. to
prevent water leakage (see Figure 6).
FIGURE 6
SINGLE PHASE,115/ 230 VOLT AC (PSC)
Power Cable (12a)
Motor Lead Number
Green (Ground)
Green
Black
1
White
2
Flag Terminal
Capacitor
Flag Terminal
Capacitor
THREE PHASE, 200/230 VOLT AC
Power Cable (12a)
Green (Ground)
Black
Red
White
THREE PHASE, 460 VOLT AC
Power Cable (12a)
Green (Ground)
Black
Red
White
FIGURE 7
11
Connectors
Connector
Motor Lead Number
Green
1 & 7
2 & 8
3 & 9
4, 5 & 6 Together
Connectors
Connectors
Motor Lead Number
Green
1
2
3
4 & 7 Together
5 & 8 Together
6 & 9 Together
E
N
G
L
I
S
H

Publicidad

Capítulos

Tabla de contenido
loading

Tabla de contenido