®
R&S
ENY-ITS
1.1 Installation
Disconnect the ISN from the communication network, auxiliary equipment and other
devices before using the R&S ENY-ITS. Before putting the instrument into operation,
connect the ISN with the ground plane. Operation without earth leakage connection is
prohibited.
Operate the equipment only in dry surroundings (indoor use). Allow any condensation
that occurs to evaporate before putting the instrument into operation. Do not exceed
the permissible ambient temperature, humidity or air pressure. The instrument is not
suitable for use in an explosive atmosphere.
Only approved accessory items, connectors, adapters, etc. are to be used to ensure
safe operation.
Immunity tests should preferably be performed in shielded rooms.
Circuits inside the ISN are not protected by fuses. Provide adequate arrangements to
protect the ISN against overload.
1.2 Applicable Safety Standards
Development and manufacture of the instrument complies with ISO 9001. The product
meets the requirements of the Low Voltage Directive (LVD) 2006/95/EC based on
IEC/EN 61010-1:2001.
Operating Manual 1309.8978.14-01
Safety Instructions
6