Technical Manual
2. Packaging contents
1 ZM20 & 40 (& ZM40K) with
• Mounting accessory kit :
– Cap + seal int.
– IP68 + seal
– 4 stainless steel fixing brackets + screws
• 2x4mm² cable pre-equipped with terminal lugs for electrical connection
• Technical manual (this document)
3. Electrical connection
Installation of this product involves a hazard of electric shocks. We strongly recommend you
contract a professional installer. Incorrect installation places you in danger and may irre-
versibly damage the product and the equipment connected to it. In compliance with the NF C
15-100 standard, pool lights installed in Volume 0 must always be powered with SELV (Safety
Extra Low Voltage). Always cut off the power upstream before handling the electrical instal-
lation.
Risk of electric shock. Only connect to a circuit which is protected by a ground-fault circuit
interrupter. If you are not sure if these types of devices are fitted, contact a qualified electrician.
1. Place the o-ring in the dedicated housing of the bayonet plug (refer to picture). Before the assembly it
is required to lubricate the o-ring to ensure a proper tightening. (A)
2. Pass the cable through the cable gland of the bayonet plug.
3. connect the cable at the back of the light and check if the tightening is well done.(B) (Don't strip the cable
to ensure a good tightening in the cable gland)
4. Let the cable gland open and fix the bajonet plug onto the back of the light. Check if the o-ring is well
placed between the bajonet plug and the light (C). According to the tightening you may hear 2 or 3 clicks.
5. Tighten the cable gland (D) und check if the black cable sheath is clamped as well.
The cable to connect at the light is the one with the shortest stript part (2.5cm). The other part
(6cm stript part) is for the connection at the 12V AC power supply..
ZM20 & 40 (& ZM40K)
v3.0ML
3