123793 - GB
G - Stage 17:
Drill the 11 planks (#6) as per the diagram in stage 17.
Then install the planks starting by the top and placing plank #6 against the already in place plank
#2.
Here is a suggestion for the positioning of the climbing holds.
To install them, drill the plank with the Ø12 drill bit at the desired points, push in the threaded insert
(#26) by hitting it with a mallet and attach the climbing hold #24 as per the attached diagram.
H - Stage 18:
Then drill floor #25 as per the stage diagram.
Install the slide on the floor with the recommended screws.
I - Stage 19:
To assemble and fix the gantry part with the Tower. To put the various tackles on the beam
at the dimensions given page 5.
K - Stage 20:
Cement the portal frame using the real measurements, between the posts, once assembled.
22 Notice N°123 793 Rev B