Kramp GOPART FGP455239GP Manual Del Usuario página 10

Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 82
STEP 5: CONNECTING THE SOLID LINKAGE
1.
Connect the solid linkage through the bottom fix plate using the Ø8 flat
washer and tighten
2.
Connect the other end of the linkage to the flow control with an Ø8 flat
washer and M8 lock
3.
Install the hopper screen in the bottom of the hopper.
UK
4.
Before using the spreader make sure all the hardware is tightened.
5.
Use the rain cover as needed to protect material in the hopper or when
spreader is being
10
with a M8 lock nut.
nut.
stored.
Screen
Solid Linkage
Put the Flat washer Ø8 onto one
end of Solid Linkage. Insert it
into the hole on the Bracket and
tighten by Lock Nut M8.
Rain Cover
Note: the bracket
needs to face oppo-
site when Assem-
bling to the handle
Put the Flat Washer Ø8 on the
Solid Linkage and insert into the
hole. Fasten by Lock Nut M8.

Publicidad

Tabla de contenido
loading

Tabla de contenido