1.
INSTALLATION AND LEVELLING.
1.1
On receipt. Inspect the unit for any damage incurred during transit. Check the
loose components against the Packing List below.
Qty
1
4
2
1
1
1
1
1
1
4
1
1
1
1
1
4
1
1
1.2
Fit the following loose packed items on to the machine:
(a)
Corn Emery Feeder Unit (Black Hopper) to the Mounting Block on the
top right hand side of the machine.
(b)
Drip Tray below the Road Wheel.
(c)
Water Tower & Bracket Assembly, inc. water feed pipe. Do not over
tighten the pipe gland, but ensure it is airtight.
(d)
The Weight onto the Pivoted Arm. This operation requires two
personnel.
1.3
BS812 requires the machine to be rigidly mounted on a firm and level
concrete base. The Anti-vibration Mounting Pads supplied are considered
acceptable for mounting on any firm and rigid level surface.
1.4
Levelling.
face across the tyre in a horizontal plane. This can be achieved by placing a
spirit level laterally across the Pivoted Arm of the machine and adjusting the
front in relation to the rear. When running, with the Flour Emery Feeder in
operation and with the correct water/powder ratio, the slurry formed on the
Item
Operating Instructions
Specimen Moulds
Mould Plates
Flour Spreader
Feeder Unit (Corn Emery)
Feeder Unit (Flour Emery)
Water Tower & Bracket Assembly
Drip Tray
Tyred Wheel (Flour Emery)
Anti-Vibration Mounting Pads
1.2mm Hexagon Socket Wrench
4mm Hexagon Socket Wrench
5mm Hexagon Socket Wrench
6mm Hexagon Socket Wrench
17mm Hexagon Socket Wrench
Rubber Rings (Road Wheel)
Certificate for Tyre Rubbers
Weight
It is important when levelling the machine to maintain the running
- 6 -