PRELIMINARY OPERATIONS

The new series of actuadors BLITZ, has been devised to serve gates up to 800 Kg with leaf up to 3 meters wide (look at the table technical
data). Before proceeding with the installation, please make sure that your gate opens and closes freely, and that:
• Pintles and pivots shall be in good order and properly lubricated
• Nothing shall block the movement
• No friction with earth and between the doors shall exist (mechanical expansion from 7 to 8 mm min.)
• Your gate has to be equipped with central stop (1) and possibly side limits (2)

INSTALLATION MEASURES

To carry out a proper installation of the operator parts as well as to ensure the best automation performance, the measurement levels
shown in the following table shall be complied with. Change the gate structure to adapt it to one of the cases in the table, if necessary.
γ γ
B [mm]
A [mm]
20 ÷ 40
50 ÷ 80
90 ÷ 140
150 ÷ 160
90°
170 ÷ 180
180 ÷ 220
220 ÷ 250
250 ÷ 320
20 ÷ 60
70 ÷ 110
100°
110 ÷ 150
150 ÷ 200
20 ÷ 50
110°
50 ÷ 100
110 ÷ 130
C [mm]
140
650
140
650
150
650
160
650
180
650
180
650
180
600
200
600
170
650
180
650
190
650
200
650
180
650
200
650
210
650
9