swissflex uni 12_75K bridge Modo De Empleo página 12

Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 16
After a power failure
Before resuming use of the uni 12_75K, press and
hold the button (5), until all sleep areas have reached
the horizontal position and the motors have stopped
moving.
Activating the emergency set-down
Press the «All motors down» button (5) on the cable
remote control to reach the horizontal (basic) posi-
tion. The repeated use of the emergency set-down
function puts a lot of strain on the batteries so that
they must be replaced.
Problem
Possible cause
Remote control or
No mains supply.
control system not
Manual switch or control system defective.
working.
Control systems
Thermoswitch on the transformer may have
suddenly no longer
been triggered or may be defective.
travel / move.
Thermal cut-out in the transformer may have
been triggered or may be defective.
Internal fuse may have been triggered or may
be defective.
No mains supply.
Supply line (mains and / or manual switch /
auxiliary control system) interrupted.
The battery-operated
Block battery / block batteries flat.
electric reset function
Block battery/batteries not connected.
cannot be activated.
12
Operating instructions
Technical data
Supply voltage: 110–240 Volt / 50-60 Hz
Thrust motors: 6000 N
Supply emergency set-down function:
1x 9 V block battery
Total connected load: 140 W / 6A
Temperature range: + 5 °C to + 40 °C
Solution
Restore mains connection.
Contact your supplier / stockist.
Leave the control system in the rest position for 20-30 minutes.
Contact your supplier / stockist.
Contact your supplier / stockist.
Restore mains connection.
Check the supply line and restore contact if applicable.
Check and replace the block battery / block batteries if necessary.
Connect the block battery / block batteries.
EN

Publicidad

Tabla de contenido
loading

Tabla de contenido