Weka Holzbau FINTURA 3 Instrucciones De Montaje página 6

Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 14
Assembly recommendations
Please drill pilot holes for all screw connections to avoid damaging the wood. The following symbol in the
instructions will indicate when this is necessary:
General assembly of the wall elements
Figure shows a cross-section through a wall
section with profile wood boarding on both sides.
All wall elements are equipped with a vapour
barrier and heat insulation..
Before erecting the individual elements, take care to ensure that the groove side (viewed from
outside) is always on the left.
Mounting timber has been incorporated into the wall elements for the bench mountings. These are located
approx. 36 cm and 80 cm above the floor. The location of this timber can be seen at the visible screw heads
in the element frames.
Each time you install a wall element, ensure that these screw heads are located in the lower half of
the element.
Electric cables and a sauna lamp are not included in the scope of the delivery but are available as
accessories.
To prevent the dropping of the glass door, tighten the allen screw of the braces firmly.
Note:
The long hole in pos. 3 is required for the cable penetration above the supply air element.
The assembly of the bargeboards should only be carried out once the electric cable has been laid.
Tools
You should have the following tools to hand before beginning assembly.
Spirit level
Mitre saw/
hand disk saw
Abbreviations / Symbols
cm
-
mm
-
ca.
-
-
-
Spring tape
measure
Drill
Universal cutter
Centimetre
Millimetre
approximately/approx.
Supply air
Outgoing air
Elektric
screwdriver
Hammer
Spanner
Allen key

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

512.2520.13.00

Tabla de contenido